Total cost overrun of delayed central sector projects within the steel industry in India

Annual · INR billion · 1995–2024 · Published by India — Reserve Bank of India

Latest · 2024

6.2587 INR billion

down −78.1813 INR billion vs 2023

Ten-year high
84.44 INR billion · 2023
Ten-year low
-2.126 INR billion · 2018

INR billion

Use this series in your AI

Use FactIQ to chart rbi::rbi|0c520ad1b16cc118 over the last ten years, with its latest value and the change over the past year.

Paste into an AI model with FactIQ connected. How to connect

About this series

This series tracks the total financial cost overrun for delayed central sector projects specifically within the steel sector. It represents the additional expenditure incurred beyond the original sanctioned budget for these industrial projects, measured in billions of Indian Rupees on an annual basis. (Footnote: Notes : 1. Data relate to central sector projects costing Rupees 100 crore and above up to 2010. From 2011 onwards data pertain to projects costing Rupees 150 crore and above. 2. Projects without date of commissioning are not considered. 3. Cost overrun is taken as the difference between the 'anticipated cost' and the 'original cost'. 4.Surface transport = Road transport + Shipping & ports. 5.Others = Heavy Industry+ Defence Production + Health & family welfare + Urban Development. Source : Ministry of Statistics and Programme Implementation, Government of India.)

Series ID
rbi::rbi|0c520ad1b16cc118
Frequency
Annual
Units
INR billion
Coverage
1995 – 2024
Total cost overrun of delayed central sector projects within the steel industry in India: 6.2587 INR billion for 2024 · FactIQ