Actual Net Interchange from PowerSouth Energy Cooperative to Midcontinent Independent System Operator (MISO), Hourly Local Time
Hourly · megawatthours · Published by Energy Information Administration
Actual Net Interchange from PowerSouth Energy Cooperative to Midcontinent Independent System Operator (MISO), Hourly Local Time
Updated 20 Nov 2026
Category | Actual Net Interchange from PowerSouth Energy Cooperative to Midcontinent Independent System Operator (MISO), Hourly Local Time |
|---|
Showing 0 to 0 of 0 entries
Use this series in your AI
Use FactIQ to chart eia::EBA.AEC-MISO.ID.HL over the last ten years, with its latest value and the change over the past year.
Paste into an AI model with FactIQ connected. How to connect
The same rows through the SQL tool of the FactIQ plugin or MCP connector.
SQL
SELECT time, value
FROM eia.data_points
WHERE series_id = 'EBA.AEC-MISO.ID.HL'
ORDER BY time;About this series
This series represents the actual net interchange of electricity from PowerSouth Energy Cooperative (AEC) to the Midcontinent Independent System Operator, Inc. (MISO), measured on an hourly basis according to local time. It tracks the flow of power between these two entities.
- Series ID
- eia::EBA.AEC-MISO.ID.HL
- Frequency
- Hourly
- Units
- megawatthours
- Dataset
- Electric Balancing Authority (EBA) Data